SITE VISIT – “Fisher and Paykel Healthcare Building” by BGT Structures & Leighs Construction: PPE Site Visit

When – 12.00-13.00 - Wednesday 26 June 2019//

Where – 15 Maurice Paykel Drive, Highbrook, East Tamaki. See map below for car parking instructions.

Agenda
11:45 Gathering
12:00 Health and Safety Short Site Induction and Site Tour

Limited to 20 engineers only. Engineers MUST be aware that once registered, they have confirmed their availability, otherwise taking other engineers’ opportunity to view this project,
You MUST bring your own PPE gear (as described below).
Please ensure you are there 15 minutes before the event starts for the compulsory Health and Safety short site induction.

The following site specific PPE is compulsory:
• hard-hat (with a minimum of 3-point chin strap),
• long sleeve shirt and trousers,
• high visibility vest or jackets with reflective strips (can be vest, shirt or jacket) and
• lace up steel capped safety footwear,
• Please be aware if you are on a construction site your clothing may get dirty.

Please register for this site visit below:

Fisher and Paykel Healthcare Building

Description:

Fisher and Paykel Healthcare Building

Registration opens at 18-06-2019 10:00

Registration closes at 25-06-2019 17:00

Max Participants: 20

Registered Users:

  1. JohnFred
  2. moham04
  3. Kitkat
  4. wangsha@hotmail.co.uk
  5. junhe898
  6. cowperh
  7. kesavan7
  8. hugh@fendall.co
  9. civilengineerjimmy
  10. Khen Lee Tan

Registration is currently closed.

Abstract

The new Fisher and Paykel Healthcare building will have a total gross floor area of 35,700m2 and will consist of a mix of R&D, pilot manufacturing and warehousing areas. The building consists of large portal frames manufactured in Thailand. The large portal frames have a clear span of up to 48m to achieve column free spaces for the manufacturing and distribution centre requirements. The building also consists of Post Tension (PT) slab due to the high floor loadings.

Project Team
BGT Structures – Associate Director/Project Engineer: Martin Wong
Leighs Construction – Project Manager: Chad Glover